Designs, sizes and grades
Each design, size and grade sells at its own rate. Items carry their HSN and unit (box, square metre or piece), and you can import them from Tally or Excel.
6907
Ceramic tiles
6910
Sanitaryware
8481
Taps, valves
Floor and wall tiles by the box, sanitaryware and fittings by the piece, full trucks from the factory and part loads to sites. Moharbill keeps the HSN, the e-way bill and the builder's dues in order.

What's hard in tiles and sanitaryware
Each design, size and grade sells at its own rate. Items carry their HSN and unit (box, square metre or piece), and you can import them from Tally or Excel.
6907
Ceramic tiles
6910
Sanitaryware
8481
Taps, valves
Tiles are heavy and high in value, so most loads cross the e-way bill limit. Make it from the IRN, change the vehicle with Part-B and extend if the truck is held up.
Projects pay in stages. Credit limits per party, the A–E grade and reminders keep dues from piling up across sites.
Warning shown before billing over the limit
Your problem → our feature
| When this happens | Moharbill does this | Feature |
|---|---|---|
| A full truck arrives from the factory | Purchase bill entered; TDS sec 393 tracked once you cross ₹50 lakh with a supplier | TDS on purchases |
| A part load goes to a site | Ship-to address and e-way bill from the IRN | E-way bill |
| Broken boxes come back | Credit note against the bill, in GSTR-1 by itself | GST returns |
| A builder pays in stages | Credit limit, A–E grade and reminders | Collections |
| CA asks for data on the 10th | CA has a free seat; GSTR-1 working and JSON ready | GST returns |
Tiles billing guide
Tiles and sanitaryware are heavy, fragile and sold in large values, which puts three things at the centre of a dealer's day: the e-way bill for each load, credit notes for breakage, and credit to builders who pay as their projects move.
| What you sell | HSN | GST rate |
|---|---|---|
| Ceramic and vitrified tiles | 6907 | 18% Check with CA |
| Ceramic sanitaryware (WC, basin, urinal) | 6910 | 18% Check with CA |
| Taps, mixers and valves | 8481 | 18% Check with CA |
For a load above the limit, make the e-way bill from the IRN before the truck leaves. If the load is moved to a smaller vehicle for the last stretch to the site, update Part-B with the new vehicle and the reason (transhipment); the e-way bill number stays the same. The free e-way bill validity calculator tells you how many days a distance gives you.
When boxes come back broken or a builder returns unused stock, raise a credit note against the original bill. It brings down the party's dues, appears in GSTR-1 for the month, and stays linked to the bill it corrects.
Your language
The app and every WhatsApp message work in English, Hindi, Gujarati, Marathi and Tamil. Each builder, plumber or retailer gets reminders in their own language.
Sample bill
Every Rule 46 field, 6-digit HSN on each line, scheme discount shown, IRN and QR printed, and the e-way bill number on top. Sample data.
GST rates shown are examples. Check your item's rate in the HSN master.
Ambica Tiles & Sanitary
Station Road, MIDC Hingna, Nagpur 440016 · Maharashtra
GSTIN 27AAQFS4471B1Z2
Tax invoice
INV/26-27/0745
16-10-2026
Bill to
Sai Developers
GSTIN 27ABJFO2210K1ZV
Place of supply: 27 · Maharashtra
Ship to (site)
Site: Sai Residency, Wing C, Nagpur
EWB 2412 0076 3390 · MH 01 CX 2276
| Item | HSN | Qty | Rate | Amount |
|---|---|---|---|---|
| Glazed vitrified tile 600×600 mm (box of 4) | 690721 | 220 | ₹760.00 | ₹1,67,200.00 |
| Ceramic wall tile 300×450 mm (box of 6)Scheme applied · 2% off ₹1,456 | 690722 | 140 | ₹520.00 | ₹71,344.00 |
| Wall-hung WC with seat cover (piece) | 691010 | 24 | ₹6,400.00 | ₹1,53,600.00 |
| Single-lever basin mixer (piece) | 848180 | 24 | ₹2,850.00 | ₹68,400.00 |
IRN
5c7e…19ad40f2b6
Amount in words
Rupees five lakh forty-three thousand four hundred forty-two only
FAQ
Ceramic and vitrified tiles are in 6907, ceramic sanitaryware such as WCs and basins in 6910, and taps and mixers in 8481. Above ₹5 crore turnover use 6 digits, for example 690721 or 691010. Check each code with your CA.
Each item has one unit, box (BOX) or square metre (SQM). Most dealers bill by box and write the square metres in the item name. Converting between boxes and square metres on the same item is not in Moharbill yet.
Raise a credit note against the original bill for the broken boxes. It reduces the party's dues and appears in GSTR-1 by itself.
Any consignment above ₹50,000 moving by vehicle does, and some states set a higher limit for movement inside the state. Moharbill makes it from the IRN.
No. Every plan includes a free CA seat.