Bags, tonnes and kilos
Cement in bags, TMT in tonnes, wire in kilos, each with the right UQC on the e-invoice. Rates per tonne multiply out on the line.
2523
Cement
7214
TMT bars
7217
Binding wire
Cement by the bag, TMT by the tonne and binding wire by the kilo, delivered to sites by the truckload and paid for when the builder's stage payment comes in. Moharbill keeps the trucks legal and the dues in view.

What's hard in building materials
Cement in bags, TMT in tonnes, wire in kilos, each with the right UQC on the e-invoice. Rates per tonne multiply out on the line.
2523
Cement
7214
TMT bars
7217
Binding wire
Nearly every load crosses the limit. Make the e-way bill from the IRN, update Part-B when the truck changes and extend before it runs out.
Buying ₹50 lakh or more a year from one cement or steel company means TDS under section 393. The tracker counts it per supplier.
Your problem → our feature
| When this happens | Moharbill does this | Feature |
|---|---|---|
| Every truck to a site | E-way bill from the IRN, Part-B and extensions | E-way bill |
| A builder pays at each slab | Credit limit, A–E grade and reminders | Collections |
| Big purchases from one company | TDS sec 393 tracked, 0.1% kept back on payment | TDS on purchases |
| Turnover crossed ₹5 crore | IRN on every B2B bill, 6-digit HSN checked | E-invoice |
| CA asks for data on the 10th | CA has a free seat; GSTR-1 working and JSON ready | GST returns |
Building materials guide
Building material suppliers move high value on thin margins. One wrong rate or an expired e-way bill on a full truck costs more than the margin on the load, so the basics have to be right every time.
| Item | HSN | GST rate |
|---|---|---|
| Cement | 2523 | 18% from 22-09-2025 (was 28%) |
| TMT bars and rods | 7214 | 18% Check with CA |
| Binding wire | 7217 | 18% Check with CA |
Give each item its unit (bag, tonne, kilo) and 6-digit HSN once. The HSN code finder helps when you set them up, and the GST calculator checks a rate in seconds.
Builders and contractors pay when their own stage payment comes in. Set the credit days you agreed per party; reminders go on the due date with a payment link, and the A–E grade tells you who pays on time before the next load goes out on credit.
Your language
The app and every WhatsApp message work in English, Hindi, Gujarati, Marathi and Tamil. Each builder or contractor gets reminders in their own language.
Sample bill
Every Rule 46 field, 6-digit HSN on each line, scheme discount shown, IRN and QR printed, and the e-way bill number on top. Sample data.
GST rates shown are examples. Check your item's rate in the HSN master.
Mahadev Building Materials
Ring Road, MIDC Hingna, Nagpur 440016 · Maharashtra
GSTIN 27AAQFS4471B1Z2
Tax invoice
INV/26-27/0391
16-10-2026
Bill to
Shivam Constructions
GSTIN 27ABJFO2210K1ZV
Place of supply: 27 · Maharashtra
Ship to (site)
Site: Shivam Heights, Phase 2, Nagpur
EWB 2412 0076 3390 · MH 40 CT 5521
| Item | HSN | Qty | Rate | Amount |
|---|---|---|---|---|
| Portland pozzolana cement, 50 kg (bag) | 252329 | 400 | ₹330.00 | ₹1,32,000.00 |
| TMT bar Fe 500D 10 mm (tonne) | 721420 | 4 | ₹55,600.00 | ₹2,22,400.00 |
| Binding wire (kg) | 721720 | 150 | ₹76.00 | ₹11,400.00 |
IRN
5c7e…19ad40f2b6
Amount in words
Rupees four lakh thirty-one thousand six hundred forty-four only
FAQ
Cement (HSN 2523) moved from 28% to 18% from 22 September 2025. TMT bars and binding wire are at 18%. Check the rates for your items with your CA.
Yes. Each item has its own unit (bag, tonne, kilo), and the e-invoice carries the right UQC for each line.
Any consignment above ₹50,000 moving by vehicle does, and some states set a higher limit for movement inside the state. Moharbill makes it from the IRN; you add the vehicle.
Yes, on Pro and Business. The section 393 tracker counts purchases per supplier against ₹50 lakh and keeps back 0.1% on payments once crossed.
No. Every plan includes a free CA seat.